june 2023 - july 2024  ➤

First of Type Testing for Flitzer Z2

  • After Fist flight experienced issues contracted to complete the Flight Test Campaign.

  • Several design changes required after test discoveries leading to a 10-month programme before the owner “soloed” in Jul 2024.

  • All flight test reports and submissions generated in a cost-effective manner for the customer and Authority.

Previous
Previous

Obtain Type Qualification on the Tecnam P2006T for CFS Aeroproducts Ltd

Next
Next

Signed Contract for Support to CFS Aeroproducts Ltd